A room can look and feel dry to the touch while moisture meters still show trapped moisture inside wall cavities or under flooring.
Our Plymouth, NH drying plans start with thermal imaging to map exactly where moisture is hiding.

We calculate drying requirements using temperature and humidity data, not a flat per-room rule.
LGR capacity is standard equipment on every Structural Drying And Dehumidification job, not a premium upgrade.
We map hidden moisture with thermal imaging before finalizing equipment placement.
Daily logs give you and your insurer verifiable proof of progress, not a technician's word.
Below is the calculated, documented process our Plymouth, NH teams follow.

We calculate temperature, humidity, and grain depression readings to build the drying plan.
Thermal imaging often reveals moisture has traveled further than the visible damage suggested.
Dehumidifier capacity is matched to the calculated moisture load for that specific space.
Documented logs track the numbers from day one through final verification.
Hardwood floors and built-in cabinetry require slower, more controlled drying to avoid warping.
Final verification compares closing readings against the material-specific dry standard, not a general guess.
A quick call helps us determine whether thermal imaging and full drying equipment are needed.
Equipment for psychrometric assessment is standard on every drying dispatch.
You'll see the calculated plan and cost before drying equipment goes down.
We verify final moisture readings against dry standard before removing equipment.

"The thermal imaging found moisture behind a wall that looked completely fine from the outside. Would have missed it otherwise." — Julian R.
"They came back every single day to take readings and showed me the numbers improving. Felt like real science, not guesswork." — Monique T.
"Our hardwood floor didn't warp because they slowed the drying process down specifically for it." — Grant P.
A room can look dry on the surface while moisture meters still detect trapped moisture inside materials.
It's a calculated approach using temperature and humidity data to determine exact equipment needs, rather than guessing.
Typical drying time is 3-5 days for standard materials, longer for sensitive ones like hardwood.
You'll see the actual numbers improve each day through documented logs.
We adjust the drying plan whenever sensitive materials are involved.
A stall in the daily logs triggers a plan review rather than simply leaving equipment running unchanged.
If your property is in or near Plymouth, a crew can typically respond the same day.

Speak directly with our structural drying team.
Call +1-844-833-1325